Tell us about your site count, user roles, and access requirements. We will map the architecture before any code is written.
Feedback from plant managers, IT directors, and operations leads who run corporate portals on our backend systems across Malaysia and the wider region.
We rolled out the intranet to three sites in one quarter. The access control model matched our existing AD groups, so field supervisors got the right documents without a single support ticket about permissions.
Kedah, MalaysiaThe backend portal replaced a patchwork of spreadsheets and shared drives. Data sync between the ERP and the portal runs on schedule, and the audit trail gives us a clear view of who changed what.
Johor, MalaysiaWhat stood out was the planning discipline. Dariawebdesign mapped every user role before writing code, and the dark interface with cyan highlights made the shift from our old system much easier for the office team.
Perak, MalaysiaWe needed a secure document hub for shift handovers and maintenance logs. The portal handles both, and the mobile view works well for supervisors walking the plant floor.
Selangor, Malaysia